Temporary Chemical-Physical Treatment for Dairy Wastewater Treatment
The Challenge
The existing treatment setup struggled to efficiently remove biologically active sludge from dairy wastewater, resulting in inconsistent performance and high load on downstream processes.
The Solution
A temporary installation was implemented including the eletrical panel and a PFL DAF Unit, to significantly enhance solid-liquid separation within the flotation process.
The Results
The upgraded system delivered stable and improved treatment performance, leading the client to continue operations by renting the installation for over six months.
Project Gallery
Products used in this project
Facing a similar wastewater challenge?
Let's discuss your situation and engineer the right solution together.